Business development and project management in the EU project Coordinet

Long lead times and the current regulations surrounding the expansion of the electricity grid lead to the grid not being adapted to the accelerating energy transition and electrification. This in turn risks leading to societal problems with periodic power shortages and long lead times for new connections. Within the EU project Coordinet, they wanted to investigate whether capacity markets and flexibility could be a potential solution to capacity challenges in the electricity grid.

Positioning around incentives for flexibility solutions in electricity network regulation

E.ON Energidistribution has for several years conducted projects and business development within flexibility solutions and has thus been a leader in the industry in this area. However, a significant challenge, both for E.ON and the industry as a whole, is that there is a lack of financial incentives in the electricity grid regulation to use flexibility solutions.

Technical Lead Innovation project

För att tackla nya regulatoriska krav samt att möjliggöra samhällsutbyggnad utan en kostsam infrastrukturell utbyggnad, har E.ON i UK skapat ett smart nätverk som gynnar hållbar husutveckling.
Detta nya koncept garanterar att det lokala elnätets kapacitet inte överskrids.

Work package leader EU project ANM4L

ANM4L has investigated and demonstrated solutions to increase the utilization rate of existing grid assets while maintaining security of supply. The ANM4L project has studied how to prevent overload and overvoltage situations in distribution networks, which arise from increased levels of distributed RES.